Since my last update on construction a lot has happened. The roof has been shingled and the front porch poured. All of the rough electrical, plumbing, and gas as well as the tubs are in so they did the four way inspection was one week ago. After that was out of the way put in the insulation and dry walled the upstairs. We now have real walls and the house is taking on its true dimensions. It is now down to installing all of the individual things that will give it it's unique character.
 |